Rakel Investment

Energy · 2024

Solar Power System for Neonatal and Critical Care Units – Bo Government Hospital

Design and implementation of a 198kWp solar PV system with 2622kWh battery storage to provide reliable power for neonatal and critical care services at Bo Government Hospital.

CompletedBo, Sierra Leone2024–2025
Solar PV system installation at Bo Government Hospital, supporting neonatal and critical care units.

Project Overview

The engagement, in detail.

Rakel Investment & General Services designed and implemented a 198kWp solar photovoltaic power system with 2622kWh battery storage to support the Neonatal and Critical Care Units at Bo Government Hospital. The system integrates solar generation, battery storage and grid connectivity, providing continuous and resilient electricity for critical medical equipment and life-saving hospital services.

Solar PV

198 kWp

Battery Storage

2622 kWh

System Type

Multi-Mode (Grid-Tied with Battery Backup)

Project Details

Client
Government of Sierra Leone
Location
Bo, Sierra Leone
Project Period
2024–2025
Status
Completed
Division
Rakel Energy
Category
Energy

Scope of Work

What the assignment covered.

01

Engineering Design & System Planning

02

Procurement of Solar PV Modules & Battery Storage Systems

03

Installation of Mounting Structures & Electrical Systems

04

Inverter Configuration & Grid Synchronization

05

System Testing & Commissioning

06

Capacity Building & Training for Hospital Staff

Project Gallery

A closer look.

01 / 02

Related Expertise

Services applied on this project.