Energy · 2024
Solar Power System for Neonatal and Critical Care Units – Bo Government Hospital
Design and implementation of a 198kWp solar PV system with 2622kWh battery storage to provide reliable power for neonatal and critical care services at Bo Government Hospital.
CompletedBo, Sierra Leone2024–2025

Project Overview
The engagement, in detail.
Rakel Investment & General Services designed and implemented a 198kWp solar photovoltaic power system with 2622kWh battery storage to support the Neonatal and Critical Care Units at Bo Government Hospital. The system integrates solar generation, battery storage and grid connectivity, providing continuous and resilient electricity for critical medical equipment and life-saving hospital services.
Solar PV
198 kWp
Battery Storage
2622 kWh
System Type
Multi-Mode (Grid-Tied with Battery Backup)
Project Details
- Client
- Government of Sierra Leone
- Location
- Bo, Sierra Leone
- Project Period
- 2024–2025
- Status
- Completed
- Division
- Rakel Energy
- Category
- Energy
Scope of Work
What the assignment covered.
01
Engineering Design & System Planning
02
Procurement of Solar PV Modules & Battery Storage Systems
03
Installation of Mounting Structures & Electrical Systems
04
Inverter Configuration & Grid Synchronization
05
System Testing & Commissioning
06
Capacity Building & Training for Hospital Staff
Project Gallery
A closer look.
01 / 02
Related Expertise
